The short answer. A kitchen remodel in San Diego runs in a fixed order: design and selections, a fixed-price contract, the permit, demo and rough-in, inspection, then cabinets, counters and finish. Most of the risk sits in the first 2 steps. When every cabinet, counter and appliance is picked before demo, your job doesn’t stall waiting on a decision.
Kitchens go wrong in the same places. The stone shop can’t template your counters until the cabinets are set and level, so one late cabinet holds up the counters, the plumber and your sink. An island drawn without the aisle it needs blocks the dishwasher door. A wall that comes out without an engineer’s beam turns up at resale. And a hood that recirculates when it could’ve vented outside leaves the kitchen smelling like dinner for 2 days.
We’re IO Builders Group, a licensed design-build contractor based in Scripps Ranch, CSLB #1159596, with a B General Building license. Your kitchen is designed, priced, permitted and built by one team under one fixed-price contract. Here’s how it runs.
The layout decisions that matter most
Layout is the one decision you can’t fix later with a better finish. We start with the National Kitchen and Bath Association’s planning guidelines and adjust them to how you cook.
- Aisles. At least 42 inches of work aisle for one cook and 48 for two. A walkway past the kitchen gets 36.
- The work triangle. Sink, cooktop and refrigerator, with each leg between 4 and 9 feet and the total under 26.
- Landing space. Counter on both sides of the cooktop, beside the refrigerator’s handle and on both sides of the sink, so a hot pan or a full bag always has somewhere to go.
- Swing. The dishwasher, oven and refrigerator doors have to open fully without hitting the island, a corner or each other.
Moving the sink, the range or a gas line is where layout changes get expensive. Most San Diego homes from the 1960s to the 1980s sit on a slab, so a moved drain means cutting concrete. A wall that comes out needs an engineer, a sized beam, posts and footings, and a permit. Many of them are worth it. Just decide on paper first. Our post on kitchen layout mistakes shows the common ones.
Selections before demo
Before we open a wall, these are chosen and ordered: cabinets, counters, sink and faucet, every appliance, backsplash tile, light fixtures and hardware. Appliances matter most, because their spec sheets set the cabinet openings, the gas line, the hood duct and the circuits. Cabinets carry the longest lead time, so they’re ordered first. If you’re weighing cabinet lines, read our guide to kitchen cabinet types.
How we build a kitchen, step by step
1. Consultation.
About 20 minutes on the phone, then a site measure. We look at what’s wrong with the kitchen today and what you want to change.
2. Design and selections.
Layout, elevations, a lighting plan and every finish, on paper.
3. Fixed-price contract.
Written from the drawings, with milestone payments tied to work done. Changes happen through a written change order you approve first.
4. Permit.
We pull it before demo, under our license.
5. Demo and rough-in.
Plumbing, gas, electrical and the hood duct go in. The inspector signs off on the rough work before any wall closes. We set up a temporary kitchen station and keep water running as long as we can.
6. Cabinets, counters, finish.
Cabinets go in level. Then the counters get templated, cut and set. Backsplash, appliances, the sink and fixtures follow.
7. Final inspection, walkthrough, punch list.
The inspector signs off. Then we walk the kitchen with you, write down anything that isn’t right and fix the list before we call it done.
For the planning side in more depth, read how to plan a kitchen remodel in San Diego.
Permits: what the inspector looks at
Like-for-like cosmetic work, such as new cabinet fronts or a counter on the same cabinets, generally doesn’t need a permit. Moving plumbing, altering gas, adding circuits or changing a wall does. The inspector checks what’s behind the finish. Under California’s electrical code, countertop outlets are spaced so no point along the counter is more than 24 inches from one, the counters are served by at least 2 dedicated 20-amp circuits, and those outlets are GFCI-protected. An induction cooktop or a bigger range needs a circuit sized to its spec sheet, and sometimes panel work. New light fixtures have to be high-efficacy under the state’s energy code. In the City of San Diego the permit goes through Development Services. Poway, Carlsbad and the other cities issue their own, and the County handles unincorporated areas. We figure out which one is yours, pull it and meet the inspector. Permits handled.
How long a kitchen remodel takes
A full kitchen typically runs 6 to 10 weeks of construction once the permit is issued and the materials are on site. A cosmetic refresh runs shorter. Design, selections and cabinet lead times come before that. Your schedule goes in the contract.
What drives the cost of a kitchen remodel
- Layout changes. Keeping the sink, range and refrigerator where they are costs least. Moving them on a slab means cutting concrete.
- Walls. Engineering, a beam, posts and footings.
- Cabinets, usually the biggest line: stock, semi-custom or custom, how many boxes, and whether you reface or replace.
- Counters: the material, the square footage, the edges and the cutouts.
- Appliances, plus what they need behind the wall: circuits, gas and a hood duct.
- Electrical: lighting layers, new circuits, a panel upgrade.
- Flooring, especially when it runs into the next room.
- The age of the house. Galvanized pipe and old wiring show up once the walls are open.
Your number comes from your scope, in a fixed-price contract after design. We don’t publish prices or quote a kitchen over the phone. Our post on kitchen remodel cost in San Diego goes through each driver.
Where we build kitchens
Our office is in Scripps Ranch, and we remodel kitchens across San Diego County: San Diego, Poway, Rancho Peñasquitos, Santee, Escondido, San Marcos, Carlsbad, Del Mar, La Jolla, Chula Vista, Rancho Bernardo, Encinitas and Solana Beach.
The same team builds the rest of the house. See how we run a bathroom remodel and whole-home remodeling. If you’re still comparing builders, read our guide to choosing a remodeling company in San Diego.
Kitchen remodel questions we get asked most
How long does a kitchen remodel take in San Diego?
A full kitchen typically runs 6 to 10 weeks of construction once the permit is issued and the materials are on site. A cosmetic refresh runs shorter. Design, selections and cabinet lead times come first, and your schedule goes in the contract.
Do I need a permit for a kitchen remodel in San Diego?
If plumbing moves, gas is altered, circuits are added or a wall changes, yes. Like-for-like cosmetic work usually doesn’t need one. The City of San Diego, Poway, Carlsbad and the other cities issue their own permits, and the County covers unincorporated areas. We check your address and pull what’s required.
Can we take out a wall to open up the kitchen?
Usually, with engineering. A bearing wall needs an engineer, a sized beam, posts and footings, and a permit. We find out what the wall carries before it’s on the drawing, so the price includes it.
Can we stay in the house during a kitchen remodel?
Most people do. We seal the work area, protect the path to it, set up a temporary kitchen station and clean up every day. Water stays on as long as the work allows.
Should I replace or reface my cabinets?
Reface or refinish when the boxes are sound and the layout works. Replace when the layout’s changing, the boxes are failing or the sizes have to change for new appliances.
Why do you pick every finish before demo?
Because a kitchen waits on its slowest item. Cabinets have the longest lead time, counters can’t be templated until cabinets are set, and appliance specs set the openings and circuits. Choosing first means nothing stalls once the walls are open.
How much does a kitchen remodel cost in San Diego?
It depends on layout changes, walls, the cabinet tier, counters, appliances, electrical and the age of the house. We don’t publish prices or quote over the phone. Your price is set in a fixed-price contract after design.
Talk to us about your kitchen
Call (858) 392-6767. The first conversation is about 20 minutes: how you cook, what’s not working, what has to change. Then a site measure and a design conversation. No price is quoted in the kitchen, because an honest number comes after design, in writing.
Or send us the basics and we’ll call you.
IO Builders Group. Design-build remodeling, interior and outdoor, San Diego County. CSLB #1159596. 10089 Willow Creek Rd #200, San Diego, CA 92131.
Interior & Outdoor, Built Right.
Or send us the basics on our contact page and we will call you within one business day.
Where we build this
Searching for kitchen remodeling near you? IO Builders Group handles kitchen remodeling across San Diego County from our Scripps Ranch office, including:
Also serving Rancho Bernardo, Encinitas and Solana Beach. Licensed design-build general contractor, CSLB #1159596.